ON SITE / Vehicle entrance
The buried part of a bollard installation
This installation sequence in Darwin shows hydraulic bollard housings within an open trench.

01 / THE SITE
In its surroundings.
The photographs include the exposed support framework, white service pipes and a closer view into a housing before the road surface is reinstated.
Preparing the line
The housings are positioned along a common trench and linked by visible service routes.
Before reinstatement
These are construction-stage photographs. They show the below-ground arrangement rather than a finished entrance or an approved foundation specification.
02 / INSTALLED EQUIPMENT
Behind the entrance.
INSTALLED PRODUCT
Hydraulic rising bollards
Site dimensions and equipment configurations are confirmed for each entrance.
03 / KEEP EXPLORING





