ON SITE / Residential entrance
A bollard installation beneath the paving
Eight rising bollards are listed in the supplied project record for this residential entrance.

01 / THE SITE
In its surroundings.
The photographs focus on the installation below pavement level, showing the housings, connected pipework and support frames before the surface is finished.
Below-ground coordination
The open excavation exposes the relationship between the bollard housings, pipe routes and supporting framework.
Surface completion
A supplied video shows a later paved state. The photo gallery retains the installation-stage views so the buried work remains visible.
02 / INSTALLED EQUIPMENT
Behind the entrance.
INSTALLED PRODUCT
Automatic rising bollards
- Automatic bollards
- 8
Site dimensions and equipment configurations are confirmed for each entrance.